- Client: Pomco
- Location: Tampa, Florida
- Approximate Project Value: $244 million
Project
The world’s largest, single-cable, stayed concrete bridge at a length of 29,040 feet. The super-structure consists of more than 300 pre-cast concrete segments. The segments were pre-cast at a nearby port, floated into position and erected from a gantry crane above. The bridge was erected between 1982-1987.
SERVICES
Buric prepared detailed CPM Schedule analysis of the engineering, fabrication and erection of the pre-cast concrete segments for the entire structure. Buric also analyzed labor productivity, calculated damages and successfully negotiated settlements for the pre-cast company.